FLORIDA AVENUE CANAL
PHASE 4
The entire Florida Avenue Canal project consists of widening the existing concrete flume section of the canal from Elysian Fields Avenue to Drainage Pump Station 19. In addition, modifications will be made to the existing drainage in the Peoples Triangle and along the south side of the Florida Avenue Canal to aid in getting more flow to this new canal. These modifications include the installation of sub-surface drainage, curb and gutter drainage, and pavement resurfacing along portions of Abundance, Treasure, Benefit, Deers, Eads, Painters, Montegut, and Desire streets.

The U.S. Army Corps of Engineers completed the plans and specifications for Phase 4 (St. Ferdinand to Peoples Avenue Triangle). The Corps will be responsible for the management of the construction contract. Phase 1 (DPS 19 to Mazant Street) was completed in August 2013. Phase 2 (Mazant to Piety) and Phase 3 (Piety to St. Ferdinand) were awarded in August 2014. Phase 4 (St. Ferdinand to Peoples Avenue Triangle) was awarded in September 2014 to Renda/ JBros Construction Joint Venture for $147.5 million.




Project Start Date: Sep 2014
Current Completion Date: Sep 2021
Contractor: Renda/JBros Construction
Current Construction Cost: $147.5 M
Funding: 65/35% (Federal/Local)
Current Status: Under Construction (46% complete)